Responsive Design - change order
Hi, Great software!!
In the "Responsive Design" is it possible to change the order in the "maincontent" to be:
Center (on top)
Left (in middle)
Right (on bottom)
There are several options, but not this one.
Thanks,
Ron
In the "Responsive Design" is it possible to change the order in the "maincontent" to be:
Center (on top)
Left (in middle)
Right (on bottom)
There are several options, but not this one.
Thanks,
Ron
Last Edit:9 years 2 months ago
by rpierce
Last edit: 9 years 2 months ago by rpierce.
Please Log in or Create an account to join the conversation.
Hi and thank you
no this is not possible, as the flow is relative to the html structure.If you want to do that, then in normal mode you must have your 2 columns at the right of the maincontent
CEd
no this is not possible, as the flow is relative to the html structure.If you want to do that, then in normal mode you must have your 2 columns at the right of the maincontent
CEd
Joomlack Webmaster and Developer
by ced1870
Please Log in or Create an account to join the conversation.
Hi CEd,
Thank you. This is helpful.
Have a great day!
Ron
Thank you. This is helpful.
Have a great day!
Ron
by rpierce
Please Log in or Create an account to join the conversation.
Time to create page: 0.646 seconds